July-06-2022 - Wednesday Daily Update - Mohammad Elkady
Daily Update - Mohammad Elkady - (July-06-2022)
1. What did I do today?
Today, I attended the second day of the CMG online Course.
2. What did I find interesting/Work on?
Day 2
- Dual perm is required in hydraulically fractured wells and dual por is required if the permeability of the matrix is very small.
- Forecasting different futures
○ Add range of dates first (Wells and recurrent)
○ Check you constraints for the wells
§ Monitor your oil production to shut it when it becomes uneconomic
§ Operate your well at specific conditions like BHP
§ CONT means do correct the next time step (after the violation)
§ CONT REPEAT means do correct the current time step (same as the violation)
§ It is better to have two constraints for injectors
○ Do your base prediction case
○ Change wells to injector (For water injection) by adding new wells and shut in the old wells you want to convert into injectors
- When adding a new well use the constraint of the closest well
- You can enable all the flux outputs from the simulation output in builder to have an idea about the fluid streamline in the reservoir
- in CEDIT if you do know keyword select and press f1
- Best practice in refinements is 3
- Typical workflow for CMOST
- Tracer option is very helpful in tracing the injected water vs the reservoir water
- GEM is required if you are modelling Volatile oil or interested in compositional modelling
3. What will I do next?
Next, I will work on the new model with normal water cut model till I have a good history match with both oil and water rates.
Comments
Post a Comment